Deck Construction in New Britain, CT
Deck construction in New Britain begins with the layout and the holes. Footings are placed below the frost line so the structure does not heave, and the framing above them is sized to the load. The ledger board is the connection that fails most often on older New Britain, CT decks. Ours is flashed and bolted into the house framing, never fastened through the siding and left to pull away. Because New Britain is an older industrial city where much of the housing predates 1950, no two deck sites measure the same. Slope, drainage, and access all change the framing plan, which is why deck construction in New Britain is quoted after a walkthrough.